PRETENSION
Subcase Information Entry The PRETENSION command can be used to select and activate a pretensioning bolt load.
Format
PRETENSION = option
Definitions
Comments
- Only one PRETENSION entry can be defined for each subcase.
- Combinations of PRETENSION and STATSUB(PRETENS) can be used to create more complex pretensioning sequences.
- The rules for sequencing pretensioning
subcases on the same pretension section are as:
- Pretensioning force (PTFORCE) can only be activated in the new or "fresh" pretensioning subcase for a given section. In other words, a subcase with PRETENSION pointing to PTFORCE cannot also include STATSUB(PRETENS) referencing a subcase that had already pretensioned this section.
- Pretensioning adjustment (PTADJST) may be activated in any of the pretensioning subcases for a given section. The effect of adjustment is cumulative relative to the pretensioning status reached in the respective previous subcase, as referenced by STATSUB(PRETENS).