Control which time or frequency step is displayed for dynamic response
data.
-
In the Project Tree, click on a dynamics analysis
branch to open the Analysis Workbench.
-
On the workbench toolbar, click
(Results plot) and select the desired plot from the menu.
The Dynamic time response and
Legend dialogs will open. The initial display will be
set to the peak value time step.
-
In the Dynamic time response dialog, click the (Start Animation) button to display all time/frequency steps.
-
Use the Animation time span field to narrow the animation range.
-
Move the slider to select a new starting point for the animation.
You can also use the Elapsed time field to select a start
time.
-
To return to the initial time step, click Show at
peak.
-
Click Close.