*CE_AddLinkEntitiesWithXYZs
Update connectors as group links with criteria.
Syntax
*CE_AddLinkEntitiesWithXYZs connector_mark_id entity_type entity_mark_id entity_state ce_rules ce_le_rule locator xyz_array xyz_size
Type
HyperMesh Tcl Modify Command
Description
This command updates connectors as group links with criteria.
Inputs
- connector_mark_id
- The ID of the mark containing the connectors to update. Valid values are 1 and 2..
- entity_type
- Type of entity to be added to the connectors as links.
- entity_mark_id
- The ID of the mark containing the entities to use as links. Valid values are 1 and 2..
- entity_state
- The state of the link entities. Valid values are:
- ce_rules
- Flag indicating when to make the links. Valid values are:
- ce_le_rule
- Flag indicating how to make the links. Valid values are:
- locator
- Flag that indicates how to use the XYZs. Valid values are:
- xyz_array
- The ID of the XYZ double array created using *createdoublearray command. This should always be 1.
- xyz_size
- The size of the XYZ double array. Must be a multiple of 3.
Examples
*createmark connectors 1 1-3
*createmark comps 1 1 2
*createdoublearray 6 1.0 2.5 3.0 2.0 3.0 0.5
*CE_AddLinkEntitiesWithXYZs 1 comps 1 1 0 1 1 1 6
Errors
if { [ catch {command_name...} ] } {
# Handle error
}
Version History
10-SA1-120